Multi-storey timber buildings up to 22.5 m high can already be built in the Czech Republic

5. 3. 2024

Multi-storey timber buildings up to 22.5 m high can already be built in the Czech Republic

We are pleased to inform that in the Czech Republic it is now possible to construct buildings with a structural system made of timber up to a fire height of 22.5 metres using the so-called engineering method. The use for timber buildings was confirmed on the basis of a joint expert opinion of the institutions concerned (Fire Brigade, ČAS and UCEEB ČVUT) published at the end of last year in the Bulletin of the Office for Technical Standardization, Metrology and State Testing. A systematic amendment of the relevant standards should take place in the first half of next year. Until recently, contemporary legislation in the Czech Republic prevented the development of ecological multi-storey timber buildings.

Timber Praha four-story apartment buildings in MČ Praha - Řeporyje are equipped with energy-saving technologies such as heat pumps, photovoltaic panels, geothermal wells, external blinds on windows, underfloor heating that not only heats but also cools in summer and Smart home systems.

back to news overview

20 % discount voucher from Hanák Ateliery for kitchens, living rooms and others

23. 4. 2024
20 % discount voucher from Hanák Ateliery for kitchens, living rooms and others

Hanák Ateliery provides a comprehensive service in interior design and furnishing

Subsidised mortgage for all available apartments flats of 2.89 % or 2.99 %  for 2 years

22. 4. 2024
Subsidised mortgage for all available apartments flats of 2.89 % or 2.99 % for 2 years

HYPOASISTENT specialists will help you with a mortgage from Raiffeisenbank

Arcus City: we finish work on the facade and railings of buildings G,H,I

20. 2. 2024
Arcus City: we finish work on the facade and railings of buildings G,H,I

Interior finishing works are in progress, plastering and rough flooring are finished

send updates on the project

send up-to-date information