Multi-storey timber buildings up to 22.5 m high can already be built in the Czech Republic

5. 3. 2024

Multi-storey timber buildings up to 22.5 m high can already be built in the Czech Republic

We are pleased to inform that in the Czech Republic it is now possible to construct buildings with a structural system made of timber up to a fire height of 22.5 metres using the so-called engineering method. The use for timber buildings was confirmed on the basis of a joint expert opinion of the institutions concerned (Fire Brigade, ČAS and UCEEB ČVUT) published at the end of last year in the Bulletin of the Office for Technical Standardization, Metrology and State Testing. A systematic amendment of the relevant standards should take place in the first half of next year. Until recently, contemporary legislation in the Czech Republic prevented the development of ecological multi-storey timber buildings.

Timber Praha four-story apartment buildings in MČ Praha - Řeporyje are equipped with energy-saving technologies such as heat pumps, photovoltaic panels, geothermal wells, external blinds on windows, underfloor heating that not only heats but also cools in summer and Smart home systems.

back to news overview

Last 8 available apartments at Timber

18. 11. 2025
Last 8 available apartments at Timber

Timber is nearing complete sell-out.

The Arcus City project is completely sold out

15. 9. 2025
The Arcus City project is completely sold out

All apartments in the Arcus City project have been sold. 278 units have new owners.

Arcus City and Timber Praha are nearing complete sell-out

25. 8. 2025
Arcus City and Timber Praha are nearing complete sell-out

Only a few units remain before both projects are completely sold out.

send updates on the project

subscribe to newsletter